Skip to content
  • Services
  • Software
  • About Us
  • Services
  • Software
  • About Us
  • Services

    Our Services

    Carbon Capture and Storage (CCS) Infrastructure Planning​

    Integrated design of CO2 capture, transport and storage infrastructure using SimCCSPRO

    Pipeline Routing, Feasibility Assessment, and Pre-FEED/FEED Studies

    Advanced pipeline route identification and assessment using CostMAPPRO

    Life Cycle Assessment (LCA)

    LCA for carbon capture, transport, and storage, DAC, low-carbon fuel production, and renewable energy

    CO2 Capture and Co-Benefit Assessment

    Capturable emissions, costs, and health benefits associated with carbon capture using CO2NCORD and LOCAETA

    CO2 Storage Screening and Assessment

    Screening for dynamic injection, storage potential, and sequestration costs using SCO2TPRO

    Direct Air Capture (DAC) Siting and Modeling

    DAC technology siting and performance assessment using NECTAR

    Hydrogen and Energy Systems Analysis​

    Energy research and systems analysis for low-carbon technologies, such as hydrogen, geothermal, wind, and solar​

    Stakeholder Outreach

    Stakeholder identification and outreach planning

    Project Spotlight

    Time’s Ticking: Embarking on the Wyoming Trails Carbon Hub (WyoTCH)

    Project WyoTCH—the Wyoming Trails Carbon Hub (WyoTCH, pronounced “Watch”)—is a pioneering open-access carbon hub designed to ensure that no captured CO2 is left stranded.

    Read more

  • Software

    Our Software

    SimCCSPRO​

    Looks at capture, transport, and storage to design efficient CCS systems

    CO2NCORD

    Identify and characterize carbon capture opportunities to maximize CO2 capture and minimize costs

    CostMAPPRO

    The most advanced routing software for pipelines, transmission lines, and other infrastructure

    SCO2TPRO​

    The most advanced screening tool for calculating dynamic CO2 injection, plume evolution, storage potential, and sequestration costs

    LOCAETA

    Valuable insights into the potential health effects of different emission sources

    NECTAR​

    Measures Direct Air Capture (DAC) performance, quantity and carbon footprint of heat, and much more​

    Project Spotlight

    SimWIND: Software to Support Wind Siting and Environmental Challenges

    SimWIND leverages advances from Carbon Solutions’ R&D 100 Award-winning SimCCSPRO software to simultaneously and geospatially optimize wind power siting, transmission, and delivery and grid integration.

    Read more

  • Information Hub

    Reports, Publications, & Presentations

    Reports, publications, and presentations authored by Carbon Solutions staff.

    View More

    Projects

    Our latest projects.

    View More

    News & Media

    Our recent updates, media, newsletters, and webinars.

    View More

  • About Us

    Our Team

    Check out our multidisciplinary team of experts.

    Read more

    About Us

    Learn about our founding story and values, and explore our comprehensive company overview.

    Read more

    More Options

    Careers

    See what it takes to work for us! View open positions or submit your resume.

    Read more

    Contact

    Reach out to us for any questions about our work or to see how we can collaborate.

    Contact us
Contact

Webinar: Identifying Critical Pathways for CO₂ Pipeline Networks

PreviousWebinar: The Role of Landmen in the Energy Sector: Key Players in Understanding Land Rights
NextWebinar: NWF Carbon Map: Building Wyoming’s Carbon Management and Wildlife Decision Support Tool
Contact
+1 651 327 0165
info@carbonsolutionsllc.com
Linkedin Youtube
  • Home
  • About Us
  • Our Team

  • Careers

  • Contact

  • Services
  • Software
  • Information Hub
  • Reports & Publications

  • Projects

  • News & Media

© 2025 Carbon Solutions LLC. All rights reserved.
  • Privacy Policy
  • Terms of Service
  • Cookie Settings